Product name項(xiàng)目名稱(chēng) | Zhangzhou Yunping Expressway A2, A5, A6, A9 signs漳州云平高速A2、A5、A6、A9標(biāo) |
Construction unit建設(shè)單位 | Hunan Road and Bridge Construction Group Co., Ltd., China Railway 24th Bureau, Fujian No. 1 Highway Engineering Company, CCCC No. 1 Public Bureau, Zhejiang Jiaotong Engineering Co., Ltd.,湖南路橋建設(shè)集團(tuán)有限責(zé)任公司、中鐵二十四局、福建省第一公路工程公司、中交一公局、浙江交工、 |
Project description項(xiàng)目描述 |
The starting point of the project is Wutian, Dongxia Town, Yunxiao County. The Wutian hub is connected to Shenhai Expressway. The end point is near Chishi, Jiufeng Town, Pinghe County. ; The mileage of the main line is 97.792 kilometers (including 78.017 kilometers of newly built mileage and 19.775 kilometers of the same line with the Shenhai double line). Constructed according to the standard of two-way 4-lane expressway, the design speed of the starting point to the Shenhai double-track section is 100Km/h, and the subgrade width is 26.0 meters; the design speed of the Shenhai double-track to the end section is 80km/h, and the subgrade width is 24.5 meters. The main engineering volume of the whole line is 21.43 million m3 of earth and stone, 7.5 tunnels, 1 extra-large bridge, 30 bridges, 133 culverts (passages) (the above data do not include the interchange area), and 9 interchanges. A2 standard: the total length is 9.131km, the excavation is 806,442 square meters; the fill is 934,594 square meters; the bridge is 520m/2; the culvert is 770.68m/12; the channel is 425.48m/11; Bid A5: The starting point of the project is near Baonan Village, Banzai Town, Pinghe County. The starting mileage is K56+226.2, which is connected to Shenhai Expressway. The ending point is Lianjian Village, Banzai Town, Pinghe County. middle), the total length of the route is 8.574 kilometers. It is constructed according to the standard of two-way 4-lane expressway, the design speed from the starting point to the end point is 80km/h, and the width of the roadbed is 24.5 meters. Among them, the engineering volume is 1.0399 million cubic meters of earthwork, 0.8 tunnels, 3 bridges, 7 culverts, 2 passages, 2 interchanges, and 1 service area. Bid A6: The starting point of the project is Wutian, Dongxia Town, Yunxiao County, and the Wutian hub is connected to Shenhai Expressway. The end point is near Chishi, Jiufeng Town, Pinghe County, connecting Guangdong Dapu to Chaozhou Port Expressway Zhangzhou Branch (referred to as Dapu Expressway). Zhangzhou branch line); the main line mileage is 97.792 kilometers (including 78.017 kilometers of newly-built mileage, and 19.775 kilometers of total line mileage with Shenhai double line). Constructed according to the standard of two-way 4-lane expressway, the design speed of the starting point to the Shenhai double-track section is 100Km/h, and the subgrade width is 26.0 meters; the design speed of the Shenhai double-track to the end section is 80km/h, and the subgrade width is 24.5 meters. The main engineering volume of the whole line is 21.43 million m3 of earth and stone, 7.5 tunnels, 1 extra-large bridge, 30 bridges, 133 culverts (passages) (the above data do not include the interchange area), and 9 interchanges. Bid A9: located in Huangtian Village, Jiufeng Town, Pinghe County, passing through Yangmeiping, Chicaopu, passing through Jiufeng Tunnel, passing Shipaitang, and setting up the Jiufeng Main Line Toll Station (K95+500) at Xiadian, and the end point (Stake No. YK97+ 346.962=ZK97+339.223) is located in Kuishan Village, Changle Township, Pinghe County, connecting Guangdong Dapu to Chaozhou Port Expressway Zhangzhou Branch (referred to as Dazhang Branch). The number of main projects includes 2025.25m/7 main bridges, 1248.1m/1.5 tunnels, 1 overpass of 86m, excavation of 2.9018 million cubic meters (about 29% of the stone), filling of 2.9232 million cubic meters, debit of 516,000 cubic meters, and Jiufeng One toll station on the main line, 13 RC cover culverts (including 7 road diversions), 5 tractor channel culverts, 6 round pipe culverts, there are provincial road S207 around, county road X571 (Xiuxiu Line) and rural areas along the line the way. The contract duration is 24 months, the contract amount is 469,754,009 yuan (including the tentative amount); the defect liability period: 2 years, and the warranty period is 5 years. 項(xiàng)目起點(diǎn)位于云霄縣東廈鎮(zhèn)浯田,設(shè)浯田樞紐互通與沈海高速公路相連,終點(diǎn)位于平和縣九峰鎮(zhèn)赤石附近,接廣東大埔至潮州港高速公路漳州支線(xiàn)(簡(jiǎn)稱(chēng)大漳支線(xiàn));主線(xiàn)里程97.792公里(其中新建里程78.017公里,與沈海復(fù)線(xiàn)共線(xiàn)里程19.775公里)。按雙向4車(chē)道高速公路標(biāo)準(zhǔn)建設(shè),起點(diǎn)至沈海復(fù)線(xiàn)段設(shè)計(jì)速度100Km/h,路基寬度26.0米;沈海復(fù)線(xiàn)至終點(diǎn)段設(shè)計(jì)速度80km/h,路基寬度24.5米。全線(xiàn)主要工程量有土石方2143萬(wàn)m3、隧道7.5座、特大橋1座、大橋30座、涵洞(通道)133道(以上數(shù)據(jù)均不含互通區(qū))、互通9處。 A2標(biāo):全長(zhǎng)9.131km,挖方80.6442萬(wàn)方;填方93.4594萬(wàn)方;橋梁520m/2座;涵洞770.68m/12道;通道425.48m/11道;隧道1969.5m/1.5座;互通1處。 A5標(biāo):項(xiàng)目起點(diǎn)位平和縣坂仔鎮(zhèn)寶南村附近,起點(diǎn)里程K56+226.2,與沈海高速公路相連,終點(diǎn)位于平和縣坂仔鎮(zhèn)聯(lián)建村,終點(diǎn)里程YK64+800(位于聯(lián)建特長(zhǎng)隧道中間),路線(xiàn)總長(zhǎng)8.574公里。按雙向4車(chē)道高速公路標(biāo)準(zhǔn)建設(shè),起點(diǎn)至終點(diǎn)段設(shè)計(jì)速度80km/h ,路基寬度24.5米。其中工程量有土石方103.99萬(wàn)方、隧道0.8座、橋梁3座、涵洞7道、通道2道、互通2處、服務(wù)區(qū)1處。 A6標(biāo):項(xiàng)目起點(diǎn)位于云霄縣東廈鎮(zhèn)浯田,設(shè)浯田樞紐互通與沈海高速公路相連,終點(diǎn)位于平和縣九峰鎮(zhèn)赤石附近,接廣東大埔至潮州港高速公路漳州支線(xiàn)(簡(jiǎn)稱(chēng)大漳支線(xiàn));主線(xiàn)里程97.792公里(其中新建里程78.017公里,與沈海復(fù)線(xiàn)共線(xiàn)里程19.775公里)。按雙向4車(chē)道高速公路標(biāo)準(zhǔn)建設(shè),起點(diǎn)至沈海復(fù)線(xiàn)段設(shè)計(jì)速度100Km/h,路基寬度26.0米;沈海復(fù)線(xiàn)至終點(diǎn)段設(shè)計(jì)速度80km/h,路基寬度24.5米。全線(xiàn)主要工程量有土石方2143萬(wàn)m3、隧道7.5座、特大橋1座、大橋30座、涵洞(通道)133道(以上數(shù)據(jù)均不含互通區(qū))、互通9處。 A9標(biāo):位于平和縣九峰鎮(zhèn)黃田村,經(jīng)洋梅坪、赤草埔,穿九峰隧道,經(jīng)石排堂后在下店設(shè)置九峰主線(xiàn)收費(fèi)站(K95+500),終點(diǎn)(樁號(hào)YK97+346.962=ZK97+339.223)位于平和縣長(zhǎng)樂(lè)鄉(xiāng)葵山村,接廣東大埔至潮州港高速公路漳州支線(xiàn)(簡(jiǎn)稱(chēng)大漳支線(xiàn)),路線(xiàn)總體走向?yàn)槟衔髦帘蔽飨?,路線(xiàn)總長(zhǎng)7.737公里。主要工程數(shù)量包括主線(xiàn)橋梁2025.25m/7座,隧道1248.1m/1.5座,天橋1座86m,挖方290.18萬(wàn)方(石約占29%),填方292.32萬(wàn)方,借方51.6萬(wàn)方,設(shè)九峰主線(xiàn)收費(fèi)站一處,RC蓋板涵13道(含改路7道),拖拉機(jī)通道涵5道,圓管涵6道,周邊有省道S207,沿線(xiàn)有縣道X571(秀秀線(xiàn))及鄉(xiāng)村道路。合同工期24月,合同額469754009元(含暫列金額);缺陷責(zé)任期:2年,保修期5年。
|
Supply product供應(yīng)產(chǎn)品 | Squeezing material,grouting material,superplasticizer,accelerator, anti-folding agent and other admixtures壓漿料、灌漿料、減水劑、速凝劑、抗折劑等多種外加劑 |